Integración de diferentes metodologías como herramientas para el mejoramiento de procesos en proyectos de edificación vertical en hospitales
View/ Open
Date
2023-02-11Authors
Patiño Romero, Gloria InésDirectors
Navarrete Sanchez, Carlos EduardoEvaluators
Alayon Suarez, Sara ManuelaPublisher
Pontificia Universidad Javeriana
Faculty
Facultad de Ingeniería
Program
Maestría en Ingeniería Industrial
Obtained title
Magíster en Ingeniería Industrial
Type
Tesis/Trabajo de grado - Monografía - Maestría
COAR
Tesis de maestríaShare this record
Citación
Metadata
Show full item record
PDF documents
English Title
Integration of different methodologies as tools for process improvement in vertical building projects in hospitalsResumen
El presente documento expone la integración de diferentes metodologías como: Project Management Institute (PMI), LEAN Construction, Ingeniería Concurrente y Balanced ScoreCard (BSC); y su aplicación en los proyectos de construcción de infraestructura hospitalaria.
Buscando la ejecución de proyectos que estén enfocados en resultados y con una adecuada gestión de todos los recursos para lograr una entrega con valor, cumpliendo con los requerimientos exigidos por el cliente.
Inicialmente se describe la industria de la construcción de infraestructura hospitalaria, su funcionamiento, los principales factores causantes de la baja productividad y los modelos de contratación que allí se manejan, con el fin de determinar los macroprocesos críticos de estos proyectos.
Se realiza un análisis de los macroprocesos críticos definidos anteriormente, se seleccionan los indicadores clave de desempeño (KPI) y se enlaza cada macroproceso crítico dentro del ciclo de vida de un proyecto, para vincularlo con la metodología PMI evaluando su integración.
Posteriormente, se detectan las no conformidades de los macroprocesos, estableciendo las herramientas más apropiadas, que la metodología LEAN ofrece, con el fin de eliminar los desperdicios, aumentar la eficiencia, disminuir los costos y buscar la optimización de los macroprocesos críticos analizados.
Adicional a lo anterior, aplicamos la metodología de Ingeniería Concurrente, que permite la incorporación de todos los actores del proyecto junto con la forma de contratación que respalde esta homogeneización. Permite evaluar y cotejar los procesos de los proyectos de infraestructura hospitalaria del Hospital el Tintal, Hospital San Juan de Dios y Hospital de Sullana.
Para concluir, se determina la viabilidad financiera para la ejecución de un proyecto de infraestructura hospitalaria en el que se ejecute esta integración de metodologías, terminando con la construcción de un Balanced ScoreCard y los KPI asociados.
Abstract
This document exposes the integration of different methodologies such as: Project Management Institute (PMI), LEAN Construction, Concurrent Engineering and Balanced ScoreCard (BSC); and its application in hospital infrastructure construction projects.
Seeking the execution of projects that are focused on results and with an adequate management of all resources to achieve a delivery with value, complying with the requirements demanded by the client.
Initially, the hospital infrastructure construction industry is described, its operation, the main factors causing low productivity and the contracting models that are managed there, in order to determine the critical macro-processes of these projects.
An analysis of the previously defined critical macro-processes is carried out, key performance indicators (KPI) are selected and each critical macro-process is linked within the life cycle of a project, in order to link it with the PMI methodology and evaluate its integration.
Subsequently, the non-conformities of the macro-processes are detected, establishing the most appropriate tools that the LEAN methodology offers, in order to eliminate waste, increase efficiency, reduce costs and seek the optimization of the critical macro-processes analyzed.
In addition to the above, we apply the Concurrent Engineering methodology, which allows the incorporation of all the actors of the project together with the form of contracting that supports this homogenization. It allows us to evaluate and compare the processes of the hospital infrastructure projects of Hospital el Tintal, Hospital San Juan de Dios and Hospital de Sullana.
To conclude, the financial feasibility for the execution of a hospital infrastructure project in which this integration of methodologies is implemented is determined, ending with the construction of a Balanced ScoreCard and the associated KPIs.
Keywords
Project Management Institute (PMI)LEAN Construction
Ingeniería concurrente
Balanced scoreCard (BSC)
Proyectos de construcción
Infraestructura hospitalaria
Hospital El Tintal
Hospital San Juan de Dios
Hospital de Sullana
Keywords
Project Management Institute (PMI)LEAN Construction
Concurrent engineering
Balanced ScoreCard (BSC)
Hospital infrastructure
Construction projects
Hospital el Tintal
Hospital San Juan de Dios
Hospital Sullana
Themes
Maestría en ingeniería industrial - Tesis y disertaciones académicasIndustria de la construcción
Edificios
Hospitales – Diseño y construcción
Ingeniería concurrente