Estudio de caso para Plan de Mantenimiento Preventivo (PMP) en una Startup colombiana de Tecnología Robótica
Date
2023-06-30Authors
Avila Rosero, Daniel EstebanDirectors
Delgado Arias, Juan SebastiánPublisher
Pontificia Universidad Javeriana
Faculty
Facultad de Ciencias Económicas y Administrativas
Program
Administración de Empresas
Obtained title
Administrador (a) de Empresas
Corporate Author(s)
KIWICAMPUS S.A.S
Type
Tesis/Trabajo de grado - Monografía - Pregrado
Share this record
Citación
Metadata
Show full item record
PDF documents
English Title
Case study for Preventive Maintenance Plan (PMP) in a Colombian Robotic Technology StartupResumen
Los Robots de Entrega Autónoma en las Aceras (SADR) son un servicio de entrega de última milla que se encarga de entregar paquetes de forma autónoma en las aceras. Este documento tiene como objetivo implementar un plan de Mantenimiento Preventivo (PMP) para una flota de robots operados por la startup colombiana KIWICAMPUS, los cuales entregan paquetes de alimentos dentro de los campus universitarios y colleges en Estados Unidos. El PMP es necesario para inspeccionar y mantener los motores eléctricos, evitando posibles fallos o desgaste y prolongando su vida útil con un rendimiento óptimo. El proyecto piloto se llevó a cabo en tres campus con diferentes condiciones climáticas e infraestructuras de distribución interna. Se utilizaron matrices de recolección de datos basadas en variables métricas proporcionadas por fabricantes estadounidenses de motores eléctricos, lo que permitirá mantener información precisa sobre el rendimiento de cada robot, prevenir fallos y maximizar su durabilidad. El objetivo final es minimizar el tiempo de inactividad y mejorar la eficiencia general del servicio de entrega de paquetes en los campus universitarios de Estados Unidos.
Abstract
Sidewalk Autonomous Delivery Robots (SADR) are a last-mile delivery service. Their main function is to deliver packages moving autonomously along the sidewalks. This document aims to incorporate a Preventive Maintenance plan, PMP, for a fleet of robots operated by the Colombian startup, KIWICAMPUS, delivering food packages within the campuses of several universities and colleges in the United States. A PMP is necessary to inspect and maintain electric motors, preventing possible failures or wear and thus increasing their duration under optimal performance standards. Our pilot project will allow the adoption of a suitable plan for the operation of electric motors used by robots in the environments and conditions required by different US campuses by minimizing the downtime and improving overall efficiency. It took place on three campuses under differentiated weather conditions and different internal distribution infrastructures. Data collection matrices were used based on the metric variables that appear in the data sheets developed by American manufacturers of electric motors, that will allow to maintain accurate information on the performance index by robot, prevent their failures and extend their useful life.
Keywords
Sidewalk Autonomous Delivery Robots (SADR)Servicio de Última Milla
Plan de Mantenimiento Preventivo (PMP)
Motores Eléctricos
Campuses
Keywords
Sidewalk Autonomous Delivery Robots (SADR)Last-Mile Delivery
Preventive Maintenance Plan (PMP)
Electric Motors
Campus
Spatial coverage
Colombia
Google Analytics Statistics
Collections
- Administración de Empresas [2376]